PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Cleaning around Foundation Walls at Elev. 1,2,3 Facing South-East (800x600).jpg Finished stripping the Foundation wall forms at Monumental Stairs Facing South (800x600).jpg Finished stripping the Foundation wall forms at Monumental Stairs Facing West (800x600).jpg Started unbolting the Shear Wall Panels at Elev. 5-6 2nd Floor Facing South(800x600).jpg Waterproofing around foundation walls at Elev. 5-6 Facing South-West (800x600).jpg Setting the footing forms at Elev. 7-Stair -4,5 Facing North-West (800x600).jpg Setting the footing forms at Elev. 7-Stair -4,5 Facing East (800x600).jpg Setting the footing forms at Elev. 7-Stair -4,5 Facing North -2 (800x600).jpg Waterproofing around foundation walls at Elev. 5-6 Facing East (800x600).jpg
Previous pageNext page Waterproofing around foundation walls at Elev. 5-6 Facing South-West (800x600)
Waterproofing around foundation walls at Elev. 5-6 Facing South-West (800x600)